Messaging & streaming Representative engagement

An event backbone across three sites, with leaf nodes that survive a site losing its link

NATS JetStream super-cluster

Client
Industrial IoT · EU
Region
Three sites, intermittent WAN links
Scale
3 clusters · 9 leaf nodes · 20,000 telemetry messages per second
Timeline
8 weeks
Service line
Caching & messaging

Where they started

Sites published telemetry to a central broker over WAN links that were not reliable, and a link failure meant losing data from that site entirely.

The problem, precisely

The design had to tolerate a site running disconnected for hours without losing telemetry or requiring manual reconciliation.

What we did

Deployed a leaf node per site with local JetStream persistence and an account-based subject hierarchy, so a disconnected site buffers locally and drains on reconnect.

Delivered

  • Super-cluster across three sites with leaf nodes and defined stream replication factors
  • JetStream persistence sized against measured worst-case link outage duration
  • Account and subject design so tenants can be isolated without separate brokers
  • NKey/JWT credential rotation procedure, tested including a compromised-key drill
  • Link-failure test: a site disconnected for six hours, reconnected, drained cleanly

Technologies used

  • NATS Server + JetStream
  • Leaf nodes + gateway clustering
  • Subject hierarchy + accounts
  • NKey/JWT authentication
  • Prometheus + nats_exporter

Measured result

Every number below was measured and reported to the customer. Where we do not have a measured figure, the entry is a fact rather than a percentage — we would rather be precise than impressive.

  • 0 messages lost during a six-hour link outage test
  • 20k/s telemetry messages sustained at peak
  • 3 sites operating autonomously
  • 1 credential compromise drill completed
The reusable part

Size the local buffer against the longest realistic disconnection, not the average one. WAN outages are measured in hours, not in packet loss.